Skip to Content

Calendar

 
Bay Trail Sears Point Connector Feasibility Study Workshop

Sonoma Veterans Memorial Building
126 First Street West 
Sonoma, CA 95476

Please join us for a discussion about the Bay Trail Sears Point Connector. The Sonoma County Regional Parks Department is preparing a feasibility study and preliminary engineering analysis for an approximately one-mile connection between the existing Eliot Trail and the Tolay/Tubbs Island Trail at Sears Point  in southeast Sonoma County.

The Sonoma County Regional Parks Department is preparing a feasibility study and preliminary engineering analysis for an approximately one-mile connection between the existing Eliot Trail and the Tolay/Tubbs Island Trail at Sears Point  in southeast Sonoma County.

The trail options being considered would cross the Upper Tolay Lagoon that is currently being restored. The trail connection would be located adjacent to Highway 37, just east of Arnold Drive/Highway 121 and  the Sonoma Raceway. The Study  will identify the preferred alternative route to make the connection, along with costs and environmental issues associated with trail construction and operation.

Options being considered include a trail on marsh fill, a floating boardwalk, or an elevated boardwalk.

Workshop Notice for Bay Trail Sears Point Connector Feasibility Study (PDF: 308 kB)